Andheri, Mumbai, Maharashtra
GST No. 27AQFPP9378P1ZO
Call 08048605698 86% Response Rate
Minimum Order Quantity: 100 Piece
Product Brochure
Usage/Application | Industrial |
Size | 32 mm |
Color | Industrial Flooring |
Product Type | Diamond Dowel |
Material | 32 mm |
Brand | Surya |
Packaging Type | 32 mm |
Shank Size | 110 |
Head Size | 150 |
Shank Diameter | 115 |
Power Input | 5.0 |
Storage Temperature | 21 |
I Deal In | New and Second Hand |
Standard Plate dowels | GREEN |
6 MM Thichness | Orange Colour |
Diamond Dowels are popular because they are so quick and easy to install, and economical too. Designed for use with slabs on the ground, there’s no need to drill holes in the timber formwork. Simply fix the dowel sleeve to the formwork on the first side, pour the concrete, remove the formwork, and insert the dowel plates into the sleeves before pouring the second side.
Benefits:
Applications:
Additional Information:
View Complete details
Minimum Order Quantity: 1000 Piece
Product Brochure
Usage/Application | Industrial |
Size | 110 x 110 x 6 MM |
Color | Flooring |
Product Type | Diamond Dowel |
Material | Silver |
Brand | Surya |
Packaging Type | Box |
Shank Size | 110 mm |
Head Size | 6 mm |
Shank Diameter | 110 mm |
Power Input | 350 |
Storage Temperature | 27 |
I Deal In | New and Second Hand |
110 x 110 MM | 6MM MS PLate |
Diamond Dowels - We are Manufacturing Diamond Dowels for Flooring Technology for load distribution to avoid cracks at wartehouse.GTB Floor dowel plate used with 6 mm MS Plate.
Standard Diamdond Dowel Design:
110 MM x 110 MM x 6 MM Thickness
125 MM x 125 MM x 8 MM thickness
Colour - Orange / yeelow / Blue
It can be easilyfitted into arbour.
Tapered plate dowels for formed construction joints.The industry standard for construction joints, the Diamond Dowel® System achieves superior joint stability measurements of 0.01 in (25 mm) and delivers reliable, maintenance-free and serviceable concrete flatwork. With the proven Diamond Dowel® System you can optimize materials, reduce labor costs, improve worker safety and minimize joint spalling and random cracking.
Recommended for formed construction joints in:With the proven Diamond Dowel System,
Diamond Dowels are popular because they are so quick and easy to install, and economical too. Designed for use with slabs on the ground, there’s no need to drill holes in the timber formwork. Simply fix the dowel sleeve to the formwork on the first side, pour the concrete, remove the formwork, and insert the dowel plates into the sleeves before pouring the second side.
Benefits:
Applications:
you provide the joint stability, positive load transfer and continuity of surface profile your projects demand. The Diamond Dowel® System consists of the tapered plate dowel, sleeve and installation template. The Diamond Dowel® tapered plates are available in three sizes (depending on the loads, wheel type and repetition):
Additional Information:
View Complete details
Minimum Order Quantity: 3000 Number
Product Brochure
Usage/Application | Flooring |
Size | 10 MM |
Color | Green |
Product Type | Flooring Jointing |
Material | MS |
Brand | SURYA |
Packing Type | box |
Diamond dowels are typically used for construction joints in concrete slab construction. We stock the following sizes to help you complete your pour
1/2″ Diameter in 12″, 18″, and 24″ lengths
5/8″ Diameter in 12″, 18″, and 24″ lengths
3/4″ Diameter in 12″, 18″, and 24″ lengths
We also stock 1-1/4″x18″ Epoxy dowels for MDOT Construction projects.
Other lengths and diameters available by order
Diamond plate Dowel system:Dowel plate system:The PNA Diamond Dowel® System helps you:
-Collect Retainage
-Reduce callbacks and save labor
-Optimize steel usage
-Limit liability
Installation Advantages of Diamond Dowel system:
-Reduces labor cost by 50% compared to round dowel installation
-No drilling is required
-Easy to strip forms
-Increased spacing between dowels optimizes steel use and labor
-Ensures dowel alignment with slab
Diamond Dowels are popular because they are so quick and easy to install, and economical too. Designed for use with slabs on the ground, there’s no need to drill holes in the timber formwork. Simply fix the dowel sleeve to the formwork on the first side, pour the concrete, remove the formwork, and insert the dowel plates into the sleeves before pouring the second side.
Benefits:
Applications:
Additional Information:
View Complete details